House 1 Remodeling: Hardwood Flooring Installation – Day 1

The hardwood flooring material has had some time to acclimate in House 1 and is ready to be installed.  The crew began by removing the existing 10-year-old carpet from the stairway, hallway, and bedrooms.  Once the carpet and pad was removed, they proceeded with the installation of the hardwood flooring upstairs.

Hallway

Bedroom 1

.

Bedroom 2

Bedroom 3

What a difference a day makes!  The flooring crew will return tomorrow to continue the installation downstairs.  Can’t wait to see nothing but hardwood floors!

 

Leave a Reply

Your email address will not be published. Required fields are marked *

%d bloggers like this: