House 1 Remodeling: Hardwood Flooring Installation – Day 4

On day 3 of the installation of hardwood flooring at House 1, the crew performed rough sanding of the floors followed by application of wood fillers. Today the crew performed fine sanding of the hardwood floors and installed the stair treads.

House 1 Remodeling: Hardwood Flooring Installation – Day 3

On day 2, the flooring crew finished the remainder of the hardwood installation in House 1.  Today, they moved on to the next step in the process and performed the sanding of the newly installed hardwood.

House 1 Remodeling: Hardwood Flooring Installation – Day 2

The crew returned for day 2 of hardwood floor installation.  On day 1, they installed hardwood flooring upstairs.  Today, they focused their attention downstairs.

House 1 Remodeling: Hardwood Flooring Installation – Day 1

The hardwood flooring material has had some time to acclimate in House 1 and is ready to be installed.  The crew began by removing the existing 10-year-old carpet from the stairway, hallway, and bedrooms.  Once the carpet and pad was removed, they proceeded with…